Hot-selling Welded Steel Pipe - Seamless Medium carbon steel boiler and Superheat tubes ASTM A210 standard – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Steel Pipe Factory, Lloy Steel Pipe A335 P5, Seamless Tube A335, When you've got any remarks about our firm or merchandise, please come to feel no cost to call us, your coming mail will likely be really appreciated.
Hot-selling Welded Steel Pipe - Seamless Medium carbon steel boiler and Superheat tubes ASTM A210 standard – Sanonpipe Detail:

Overview

Application

It is mainly used to make high-quality seamless carbon steel, for boiler pipes, super heat pipes

for bolier industry , heat changer pipe etc. With difference sizes and thickness

Main Grade

Grade of high-quality carbon boiler steel: GrA, GrC

Chemical Component

Element Grade A Grade C
C ≤0.27 ≤0.35
Mn ≤0.93 0.29-1.06
P ≤0.035 ≤0.035
S ≤0.035 ≤0.035
Si ≥ 0.1 ≥ 0.1

A For each reduction of 0.01 % below the specified carbon maximum, an increase of 0.06 % manganese above the specified maximum will be permitted up to a maximum of 1.35 %.

Mechanical Property

Grade A Grade C
Tensile Strength ≥ 415 ≥ 485
Yield Strength ≥ 255 ≥ 275
  Elongation rate ≥ 30 ≥ 30

Test Requirement

Hydraustatic Test:

The Steel Pipe Should Be Tested Hydraulically One By One. The Maximum Test Pressure Is 20 MPa. Under The Test Pressure, The Stabilization Time Should Be Not Less Than 10 S, And The Steel Pipe Should Not Leak.

After The User Agrees, The Hydraulic Test Can Be Replaced By Eddy Current Testing Or Magnetic Flux Leakage Testing.

Flattening Test:

Tubes With An Outer Diameter Greater Than 22 Mm Shall Be Subjected To A Flattening Test. No Visible Delamination, White Spots, Or Impurities Should Occur During The Entire Experiment.

Flaring Test:

According To The Requirements Of The Purchaser And Stated In The Contract, The Steel Pipe With Outer Diameter ≤76mm And Wall Thickness ≤8mm Can Be Done Flaring Test . The Experiment Was Performed At Room Temperature With A Taper Of 60 °. After The Flaring, The Flaring Rate Of The Outer Diameter Should Meet The Requirements Of The Following Table, And The Test Material Must Not Show Cracks Or Rips

Hardness Test:

Brinell or Rockwell hardness tests shall be made on specimens from two tubes from each lot

Product Detail

Boiler Tube


1


GB/T5310-2017

A106 Boiler Pipe


ASME SA-106/SA-106M-2015


carbon steel pipe


ASTMA210(A210M)-2012


eamless steel tubes for normal structure


ASME SA-213/SA-213M


boiler pipe IBR


ASTM A335/A335M-2018


Product detail pictures:

Hot-selling Welded Steel Pipe - Seamless Medium carbon steel boiler and Superheat tubes ASTM A210 standard – Sanonpipe detail pictures

Hot-selling Welded Steel Pipe - Seamless Medium carbon steel boiler and Superheat tubes ASTM A210 standard – Sanonpipe detail pictures

Hot-selling Welded Steel Pipe - Seamless Medium carbon steel boiler and Superheat tubes ASTM A210 standard – Sanonpipe detail pictures


Related Product Guide:

Our primary goal is to offer our clients a serious and responsible business relationship, providing personalized attention to all of them for Hot-selling Welded Steel Pipe - Seamless Medium carbon steel boiler and Superheat tubes ASTM A210 standard – Sanonpipe , The product will supply to all over the world, such as: Munich, New Orleans, Hyderabad, Due to our good goods and services, we've received good reputation and credibility from local and international customers. If you will need more information and are interested in any of our solutions, be sure to feel free to contact us. We look forward to becoming your supplier in the near future.
  • The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Mabel from Malawi - 2017.01.28 19:59
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Eleanore from Manila - 2018.09.23 18:44
    Write your message here and send it to us