Now we have highly developed devices. Our items are exported towards the USA, the UK and so on, enjoying a great popularity among the customers for alloy steel pipe, Alloy Steel Pipe Schedule Chart, Seamless carbon steel tube, We can do your customized order to meet your own satisfactory! Our company sets up several departments, including production department, sales department, quality control department and sevice center, etc.
18 Years Factory Heat Exchangers Pipe - Seamless Alloy Steel Boiler Pipes Superheater alloy pipes Heat Exchanger Tubes – Sanonpipe Detail:

Overview

Application

It is mainly used to make high-quality alloy steel pipe for high pressure boiler pipe, heat exchanger pipe and super heat pipe

Main Grade

Grade of high-quality Alloy steel: T2,T12,T11,T22, T91, T92 etc.

Chemical Component

Steel Grade Chemical Composition%
C Si Mn P, S Max Cr Mo Ni Max V Al Max W B
T2 0.10~0.20 0.10~0.30 0.30~0.61 0.025 0.50~0.81 0.44~0.65
T11 0.05~0.15 0.50~1.00 0.30~0.60 0.025 1.00~1.50 0.44~0.65
T12 0.05~0.15 Max 0.5 0.30~0.61 0.025 0.80~1.25 0.44~0.65
T22 0.05~0.15 Max 0.5 0.30~0.60 0.025 1.90~2.60 0.87~1.13
T91 0.07~0.14 0.20~0.50 0.30~0.60 0.02 8.0~9.5 0.85~1.05 0.4 0.18~0.25 0.015
T92 0.07~0.13 Max 0.5 0.30~0.60 0.02 8.5~9.5 0.30~0.60 0.4 0.15~0.25 0.015 1.50~2.00 0.001~0.006

For T91 other than above also includes Nickel 0.4, Va 0.18-0.25, Ni 0.06-0.10, Ni 0.03-0.07, Al 0.02, Ti 0.01, Zr 0.01. A Maximum, unless range or minimum is indicated. Where ellipses (…) appear in this table, there is no requirement, and analysis for the element need not be determined or reported. B It is permissible to order T2 and T12 with a sulfur content of 0.045 max. C Alternatively, in lieu of this ratio minimum, the material shall have a minimum hardness of 275 HV in the hardened condition, defined as after austenitizing and cooling to room temperature but prior to tempering. Hardness testing shall be performed at mid-thickness of the product. Hardness test frequency shall be two samples of product per heat treatment lot and the hardness testing results shall be reported on the material test report.

Mechanical Property

Steel Grade Mechanical Properties
T. S Y. P Elongation Hardness
T2 ≥ 415MPa ≥ 205MPa ≥ 30% 163HBW(85HRB)
T11 ≥ 415MPa ≥ 205MPa ≥ 30% 163HBW(85HRB)
T12 ≥ 415MPa ≥ 220MPa ≥ 30% 163HBW(85HRB)
T22 ≥ 415MPa ≥ 205MPa ≥ 30% 163HBW(85HRB)
T91 ≥ 585MPa ≥ 415MPa ≥ 20% 250HBW(25HRB)
T92 ≥ 620MPa ≥ 440MPa ≥ 20% 250HBW(25HRB)

Tolerance

Permitted Variations in  Wall thickness

Wallthickess %
outside
diameter
in.
mm
0.095
2.4
and under
over0.095
to 0.15
2.4-3.8
incl.
over 0.15
to 0.18
3.8-4.6
incl
over 0.18
to 4.6
                                          over under over under over under over under
seamless, hot finished
4inch and under                   40   0     35    0     33    0    28   0
over 4 inch     ..     ..            35    0     33    0    28   0
seamless, cold finished
over  under
11/2 and under 20     0
over 11/2 22     0

The permitted variations in wall thickness apply only to tube , except internal-upset tubes, as rolled or cold finished

and before swaging,expanding ,bending,polishing,or other fabricating operations

Permitted Variations in  Outside Diameter

outside diameter (mm) Pemitted Variation( mm)
hot finished seamless tube over under
4″ (100mm)and under 0.4 0.8
4-71/2″(100-200mm) 0.4 1.2
71/2-9“(200-225) 0.4 1.6
Welded tubes and cold finished seamless tubes
under1″(25mm) 0.1 0.11
1-11/2″(25-40mm) 0.15 0.15
11/2-2″(40-50mm) 0.2 0.2
2-21/2″(50-65mm) 0.25 0.25
21/2-3″(65-75mm) 0.3 0.3
3-4″(75-100mm) 0.38 0.38
4-71/2″(100-200mm) 0.38 0.64
71/2-9“(200-225) 0.38 1.14

Test Requirement

Hydraustatic Test:

The Steel Pipe Should Be Tested Hydraulically One By One. The Maximum Test Pressure Is 20 MPa. Under The Test Pressure, The Stabilization Time Should Be Not Less Than 10 S, And The Steel Pipe Should Not Leak. Or The Hydraulic Test Can Be Replaced By Eddy Current Testing Or Magnetic Flux Leakage Testing.

Nondestructive Test:

Pipes That Require More Inspection Should Be Ultrasonically Inspected One By One. After The Negotiation Requires The Consent Of The Party And Is Specified In The Contract, Other Non-Destructive Testing Can Be Added.

Flattening Test:

Tubes With An Outer Diameter Greater Than 22 Mm Shall Be Subjected To A Flattening Test. No Visible Delamination, White Spots, Or Impurities Should Occur During The Entire Experiment.

Hardness Test:

For Pipe Of Grades P91, P92, P122, And P911, Brinell, Vickers, Or Rockwell Hardness Tests Shall Be Made On A Specimen From Each Lot

 

Product Detail

Boiler Tube


1


GB/T5310-2017


A106 Boiler Pipe


ASME SA-106/SA-106M-2015


carbon steel pipe


ASTMA210(A210M)-2012


2


ASME SA-213/SA-213M


boiler pipe IBR


ASTM A335/A335M-2018


Product detail pictures:

18 Years Factory Heat Exchangers Pipe - Seamless Alloy Steel Boiler  Pipes Superheater alloy pipes Heat Exchanger Tubes – Sanonpipe detail pictures

18 Years Factory Heat Exchangers Pipe - Seamless Alloy Steel Boiler  Pipes Superheater alloy pipes Heat Exchanger Tubes – Sanonpipe detail pictures

18 Years Factory Heat Exchangers Pipe - Seamless Alloy Steel Boiler  Pipes Superheater alloy pipes Heat Exchanger Tubes – Sanonpipe detail pictures


Related Product Guide:

The really abundant projects management experiences and 1 to just one provider model make the high importance of business enterprise communication and our easy understanding of your expectations for 18 Years Factory Heat Exchangers Pipe - Seamless Alloy Steel Boiler Pipes Superheater alloy pipes Heat Exchanger Tubes – Sanonpipe , The product will supply to all over the world, such as: Durban, Latvia, Philippines, Now, we professionally supplies customers with our main merchandise And our business is not only the "buy" and "sell", but also focus on more. We target to be your loyal supplier and long-term cooperator in China. Now, We hope to be the friends with you.
  • We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Sara from Lesotho - 2017.02.14 13:19
    Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Kelly from Hanover - 2018.11.22 12:28
    Write your message here and send it to us