Factory made hot-sale Alloy Pipe Elbow -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are proud of the superior customer gratification and wide acceptance due to our persistent pursuit of top of the range both of those on merchandise and service for Alloy Pipe Usa , Alloy Steel Pipe P22 , Gb/T5310 , If you are interested in any of our products, please feel free to contact us for more details. We hope to cooperate with more friends from all over the world.
Factory made hot-sale Alloy Pipe Elbow -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe Detail:

Overview

Application

Seamless steel pipe for coal mine is mainly used to manufacture seamless pipe for hydraulic prop in coal mine.

Main Grade

Grade of high-quality carbon structural steel: 20#、35#

Chemical Component

Grade Chemical Component/%
C Si Mn Nb RE Cr Ni Cu Mo p S
20 0. 17 一0. 23 0.17 一0. 37 0. 35一0.65 <0. 25 <0. 25 <0. 20 <0. 035 <0. 035
35 0. 32一0. 39 0.17—0. 37 0. 50一0.8 <0. 25 <0.25 <0. 20 <0. 035 <0. 035
45 0. 42一0. 50 0.17 一0. 37 0.50 一0.8 <0. 25 WO. 25 WO. 20 <0.035 <0.035
27SiMn 0. 24一0. 32 1.10 一1.4 1.10 一1.4 W0. 30 <0.30 <0. 20 <0.15 <0.035 <0. 035
30MnNbREa 0.27 一0. 36 0. 20一0. 60 1.20 一1. 60 0.020一0. 050 0. 02一0. 04 <0. 30 <0. 30 <0. 20 <0.15 <0. 035 <0. 035
a The content of re is calculated as 0.02% ~ 0.04% added to the molten steel.

Mechanical Property

Mechanical Property
Grade Tensile strength
Rm/MPa
Yield
MPa
Elong after fracture
A/%
Reduction of area
Z/%
Shork absorption energy (KV2)/J
Steel tube wall thickness/mm
<16 >16 〜30 >30
no more less
20 410 245 235 225 20
35 510 305 295 285 17
45 590 335 325 315 14
27SiMn 980 835 12 40 39
30MnNbRE 850 720 13 45 48

Test Requirement

In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled with ingot shall be subject to low power inspection.

Supply Ability

Supply Ability: 2000 Tons Per Month Per Grade of   Seamless steel tubes for coal mining.

Packaging

In Bundles And In Strong Wooden Box

Delivery

7-14 days if in stock, 30-45 days to produce

Payment

30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

Product Detail

mechanical/Chemical&Fertilizer Pipes


eamless steel tubes for normal structure


 GB/T8162-2008


Seamless carbon steel and alloy mechanical tubes


ASTM_A519-2006


Hot finished structural hollow sections of non-alloy and fine grain steels


 BS EN 10210-1-2006


Seamless, welded and hot-dip galvanized pipe


 ASTM A53A53M-2012 


GB9948-2006-Seamless-Steel-Pipe-For-Petroleum-Cracking


GB9948-2006


API-5L-oil-casing-and-tubing-oil (1)


 GB6479-2013


High-quality-34Mn2v-35CrMo-carbon-Seamless-Steel


 GB/T 17396-2009


Product detail pictures:

Factory made hot-sale Alloy Pipe Elbow -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

Factory made hot-sale Alloy Pipe Elbow -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

Factory made hot-sale Alloy Pipe Elbow -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures


Related Product Guide:

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, belief the very first and management the advanced" for Factory made hot-sale Alloy Pipe Elbow -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe , The product will supply to all over the world, such as: Houston , Spain , Bangladesh , Till now, the items list has been updated regularly and attracted clients from around the globe. Comprehensive facts is often obtained in our web-site and you'll be served with premium quality consultant service by our after-sale group. They are likely to help you get thorough acknowledge about our goods and make a satisfied negotiation. Company go to to our factory in Brazil is also welcome at any time. Hope to obtain your inquiries for any pleased co-operation.
  • It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Carol from America - 2018.06.30 17:29
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Mary from Slovenia - 2017.11.11 11:41
    Write your message here and send it to us