If you want to know more information, like quotation, products, solutions, etc., please contact us online.
Tianjin Sanon Steel Pipe Co., Ltd. is a stockist. Our stock factory is in Cangzhou City, Hebei Province. Our main sources of goods are boiler pipes, and the representative materials are ASTM A335 P5/P11/P91/P92, ASME SA-106/SA-106M GR.B, GB/T 3087-2008 10#/20#. The representative materials of pipeline pipes are API 5L, API 5CT, the representative materials of petroleum cracking pipes GB/T 9948 are 15MoG/12CrMoVG. GB/T 6479-2013 represents the material 10#/20#, heat exchanger tubes SA179/SA210/SA192, etc., mechanical tubes GB/T 8162 represent the material 10#/20#/Q345/42CrMo, EN10210 represents the material S355JOH/S355J2H, gas cylinder tubes GB1 8248, represent the material 34CrMo4/30CrMo.
S355J2H hot-formed seamless steel tubes, as a high-strength structural steel product, must meet a series of technical and certification requirements to successfully enter the European market. This article details the relevant certification requirements.
Core Certification Requirements
1. Product Standard Compliance
EN10210 S355J2H steel tubes must fully comply with the requirements of European standards EN 10210-1:2006 and EN 10210-2:2006. These standards specify the chemical composition, mechanical properties, dimensional tolerances, and technical delivery conditions of hot-formed structural steel tubes.
2. CE Marking Certification
According to the EU Construction Products Regulation (CPR 305/2011/EU), structural steel tubes must obtain CE marking. This requires:
• Assessment of factory production control by an EU-notified body
• Declaration of performance in accordance with harmonized standard EN 10210
• Establishment of a continuous production quality control system
3. Material Performance Documentation
• Chemical Composition: Compliance with S355J2H specified limits for C, Si, Mn, P, S content
• Mechanical Properties: Yield strength ≥355MPa, tensile strength 470-630MPa
• Impact Toughness: J2 grade requires minimum impact energy of 27J at -20°C
• Non-destructive Testing: Including ultrasonic testing to ensure material integrity
4. Factory Production Control Certification
Manufacturers must establish an EN ISO 9001 quality management system and pass audits by EU-recognized bodies. This includes whole-process quality control from raw material procurement to final products.
5. Third-party Inspection Certification
European buyers typically require inspection reports from internationally recognized third parties, such as:
• TÜV Rheinland
• Bureau Veritas
• SGS inspection certificates
6. Environmental Compliance Certification
• Compliance with REACH regulations for chemical registration, evaluation, and authorization
• Compliance with EU conflict minerals regulations
Market Access Recommendations
1. Advance Preparation: The certification process may take 6-12 months and should be planned accordingly
2. Local Cooperation: Consider partnering with European distributors or local partners
3. Technical Documentation: Prepare complete technical documentation including test reports and certificates
4. Professional Consultation: Engage professional consulting agencies familiar with EU regulations
Conclusion
The entry of EN10210 S355J2H seamless steel tubes into the European market is a systematic process requiring compliance with strict technical standards and regulatory requirements. The key to success lies in early understanding and comprehensive fulfillment of all certification requirements, establishing a reliable quality management system, and building solid business relationships with European partners. As the EU places increasing emphasis on construction safety and sustainability, meeting these certification requirements is not only a condition for market access but also an important manifestation of product competitiveness.
Post time: Dec-03-2025