Popular Design for Steel Alloy Pipe -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization to the long-term to build together with shoppers for mutual reciprocity and mutual advantage for Steel Pipe Q235, Steel Pipe Xs, Ladie Analysis, For further inquires please do not hesitate to contact us. Thank you - Your support continuously inspires us.
Popular Design for Steel Alloy Pipe -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe Detail:

Overview

Application

Seamless steel pipe for coal mine is mainly used to manufacture seamless pipe for hydraulic prop in coal mine.

Main Grade

Grade of high-quality carbon structural steel: 20#、35#

Chemical Component

Grade Chemical Component/%
C Si Mn Nb RE Cr Ni Cu Mo p S
20 0. 17 一0. 23 0.17 一0. 37 0. 35一0.65 <0. 25 <0. 25 <0. 20 <0. 035 <0. 035
35 0. 32一0. 39 0.17—0. 37 0. 50一0.8 <0. 25 <0.25 <0. 20 <0. 035 <0. 035
45 0. 42一0. 50 0.17 一0. 37 0.50 一0.8 <0. 25 WO. 25 WO. 20 <0.035 <0.035
27SiMn 0. 24一0. 32 1.10 一1.4 1.10 一1.4 W0. 30 <0.30 <0. 20 <0.15 <0.035 <0. 035
30MnNbREa 0.27 一0. 36 0. 20一0. 60 1.20 一1. 60 0.020一0. 050 0. 02一0. 04 <0. 30 <0. 30 <0. 20 <0.15 <0. 035 <0. 035
a The content of re is calculated as 0.02% ~ 0.04% added to the molten steel.

Mechanical Property

Mechanical Property
Grade Tensile strength
Rm/MPa
Yield
MPa
Elong after fracture
A/%
Reduction of area
Z/%
Shork absorption energy (KV2)/J
Steel tube wall thickness/mm
<16 >16 〜30 >30
no more less
20 410 245 235 225 20
35 510 305 295 285 17
45 590 335 325 315 14
27SiMn 980 835 12 40 39
30MnNbRE 850 720 13 45 48

Test Requirement

In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled with ingot shall be subject to low power inspection.

Supply Ability

Supply Ability: 2000 Tons Per Month Per Grade of   Seamless steel tubes for coal mining.

Packaging

In Bundles And In Strong Wooden Box

Delivery

7-14 days if in stock, 30-45 days to produce

Payment

30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

Product Detail

mechanical/Chemical&Fertilizer Pipes


eamless steel tubes for normal structure


 GB/T8162-2008


Seamless carbon steel and alloy mechanical tubes


ASTM_A519-2006


Hot finished structural hollow sections of non-alloy and fine grain steels


 BS EN 10210-1-2006


Seamless, welded and hot-dip galvanized pipe


 ASTM A53A53M-2012 


GB9948-2006-Seamless-Steel-Pipe-For-Petroleum-Cracking


GB9948-2006


API-5L-oil-casing-and-tubing-oil (1)


 GB6479-2013


High-quality-34Mn2v-35CrMo-carbon-Seamless-Steel


 GB/T 17396-2009


Product detail pictures:

Popular Design for Steel Alloy Pipe -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

Popular Design for Steel Alloy Pipe -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

Popular Design for Steel Alloy Pipe -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures


Related Product Guide:

That has a sound business enterprise credit rating, exceptional after-sales provider and modern producing facilities, we now have earned an superb standing amongst our buyers across the world for Popular Design for Steel Alloy Pipe -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe , The product will supply to all over the world, such as: Pretoria, Guatemala, Kuala Lumpur, We have been seeking the chances to meet all the friends from both at home and abroad for the win-win cooperation. We sincerely hope to have long-term cooperation with all of you on the bases of mutual benefit and common development.
  • Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Martin Tesch from Israel - 2018.06.12 16:22
    Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Carey from Algeria - 2018.12.14 15:26
    Write your message here and send it to us