Seamless Alloy Pipe For Boiler -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Every member from our high efficiency sales team values customers' needs and business communication for Asme Sa210, Seamless Steel Pipe A335 P9, Large Diameter Alloy Pipe, We welcome you to definitely stop by our manufacturing facility and sit up for creating pleasant organization relationships with clients in your own home and overseas while in the in the vicinity of long term.
Seamless Alloy Pipe For Boiler -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe Detail:

Overview

Application

Seamless steel pipe for coal mine is mainly used to manufacture seamless pipe for hydraulic prop in coal mine.

Main Grade

Grade of high-quality carbon structural steel: 20#、35#

Chemical Component

Grade Chemical Component/%
C Si Mn Nb RE Cr Ni Cu Mo p S
20 0. 17 一0. 23 0.17 一0. 37 0. 35一0.65 一 一 <0. 25 <0. 25 <0. 20 一 <0. 035 <0. 035
35 0. 32一0. 39 0.17—0. 37 0. 50一0.8 — 一 <0. 25 <0.25 <0. 20 一 <0. 035 <0. 035
45 0. 42一0. 50 0.17 一0. 37 0.50 一0.8 — — <0. 25 WO. 25 WO. 20 一 <0.035 <0.035
27SiMn 0. 24一0. 32 1.10 一1.4 1.10 一1.4 一 — W0. 30 <0.30 <0. 20 <0.15 <0.035 <0. 035
30MnNbREa 0.27 一0. 36 0. 20一0. 60 1.20 一1. 60 0.020一0. 050 0. 02一0. 04 <0. 30 <0. 30 <0. 20 <0.15 <0. 035 <0. 035
a The content of re is calculated as 0.02% ~ 0.04% added to the molten steel.

Mechanical Property

Mechanical Property
Grade Tensile strength
Rm/MPa
Yield
MPa
Elong after fracture
A/%
Reduction of area
Z/%
Shork absorption energy (KV2)/J
Steel tube wall thickness/mm
<16 >16 〜30 >30
no more less
20 410 245 235 225 20 —
35 510 305 295 285 17 — —
45 590 335 325 315 14 — —
27SiMn 980 835 12 40 39
30MnNbRE 850 720 13 45 48

Test Requirement

In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled with ingot shall be subject to low power inspection.

Supply Ability

Supply Ability: 2000 Tons Per Month Per Grade of   Seamless steel tubes for coal mining.

Packaging

In Bundles And In Strong Wooden Box

Delivery

7-14 days if in stock, 30-45 days to produce

Payment

30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

Product Detail

mechanical/Chemical&Fertilizer Pipes


eamless steel tubes for normal structure


 GB/T8162-2008


Seamless carbon steel and alloy mechanical tubes


ASTM_A519-2006


Hot finished structural hollow sections of non-alloy and fine grain steels


 BS EN 10210-1-2006


Seamless, welded and hot-dip galvanized pipe


 ASTM A53A53M-2012 


GB9948-2006-Seamless-Steel-Pipe-For-Petroleum-Cracking


GB9948-2006


API-5L-oil-casing-and-tubing-oil (1)


 GB6479-2013


High-quality-34Mn2v-35CrMo-carbon-Seamless-Steel


 GB/T 17396-2009


Product detail pictures:

Seamless Alloy Pipe For Boiler -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

Seamless Alloy Pipe For Boiler -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

Seamless Alloy Pipe For Boiler -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures


Related Product Guide:

We are going to dedicate ourselves to providing our esteemed buyers together with the most enthusiastically thoughtful products and services for Seamless Alloy Pipe For Boiler -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe , The product will supply to all over the world, such as: Birmingham, Philippines, Iran, Our company upholds the spirit of innovation, harmony, team work and sharing, trails, pragmatic progress. Give us a chance and we will prove our capability. With your kind help, we believe that we can create a bright future with you together.
  • The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Heather from New Orleans - 2018.11.04 10:32
    Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Nicole from Turkey - 2018.11.04 10:32
    Write your message here and send it to us