If you want to know more information, like quotation, products, solutions, etc., please contact us online.
Tianjin Sanon Steel Pipe Co., Ltd. is a stockist. Our stock factory is in Cangzhou City, Hebei Province. Our main sources of goods are boiler pipes, and the representative materials are ASTM A335 P5/P11/P91/P92, ASME SA-106/SA-106M GR.B, GB/T 3087-2008 10#/20#. The representative materials of pipeline pipes are API 5L, API 5CT, the representative materials of petroleum cracking pipes GB/T 9948 are 15MoG/12CrMoVG. GB/T 6479-2013 represents the material 10#/20#, heat exchanger tubes SA179/SA210/SA192, etc., mechanical tubes GB/T 8162 represent the material 10#/20#/Q345/42CrMo, EN10210 represents the material S355JOH/S355J2H, gas cylinder tubes GB1 8248, represent the material 34CrMo4/30CrMo.
The global seamless steel pipe industry is experiencing significant order growth as 2025 enters its final quarter. With manufacturing schedules reaching full capacity and international shipping space continuing to tighten, we advise our clients to plan procurement strategies in advance to ensure timely project deliveries.
Industry Overview: Growing Demand and Supply Chain Pressure
The seamless pipe market continues to demonstrate steady growth, primarily driven by the energy sector's need for high-performance piping solutions. The cold-drawn seamless steel pipe market is projected to reach USD 85.6 billion in 2025, maintaining an annual growth rate of 4.2%. Current market challenges include:
Saturated Production Capacity: Major steel mills are operating at 92% capacity utilization, with average lead times extending to 45-60 days.
Intensified Shipping Pressure: Global container shipping capacity increased by 3.5% year-on-year, but demand growth reached 5.8%, causing freight rate volatility on key routes to rise to 18%.
Key Drivers: Sustained Energy and Infrastructure Investment
Demand for ASTM A106 Grade B and other seamless carbon steel pipes remains strong, particularly for oil and gas projects in the Middle East and Southeast Asia. Global energy infrastructure investment is expected to exceed USD 1.2 trillion in 2025, driving a 6.8% increase in demand for high-performance pipes.
International Export Trends: China's seamless pipe exports are forecast to surpass 6 million metric tons in 2025, with major shipments going to Saudi Arabia, Indonesia, UAE, and other Belt and Road Initiative countries.
Production Capacity Shifts: New steel mills in Vietnam and India have increased total Asian production capacity to 78.5 million metric tons.
Production and Logistics: Plan Early for Q4 Requirements
Current industry conditions show:
Tight Production Schedules: 85% of Q4 2025 capacity at major mills has been booked
Extended Lead Times: Standard product delivery periods have extended from 30 to 50 days
Shipping Uncertainty: Space guarantee rates on Trans-Pacific routes have dropped to 72%, with European route rates showing quarterly fluctuations of 12%
We recommend placing orders at least 8 weeks in advance and considering "pre-shipment inspection + bonded warehousing" models to shorten delivery cycles.
Market Outlook and Procurement Strategy
Industry analysis indicates:
Price Trends: Seamless pipe prices remained stable in Q3 2025, but logistics costs increased from 8% to 12% of total costs
Demand Structure: Demand for API 5L and ASTM A106 grade pipes in oil and gas sector grew 7.2% year-on-year
Supply Chain Restructuring: Nearshoring trends are strengthening, with production from Mexico and Turkey gaining importance
Our Capabilities and Call to Action
We supply high-quality seamless steel pipes including ASTM A106 Grade B and alloy steel pipes, offering:
Capacity Reservation: 15% emergency capacity reserved for long-term clients
Logistics Optimization: Annual space agreements with major shipping lines ensuring 95% space availability
Quality Assurance: Full product line certified to API 5L/ISO 3183 standards
We recommend clients:
Complete Q1 2026 procurement plans before November
Prefer FOB terms to mitigate logistics risks
Consider multimodal transport solutions
Post time: Oct-16-2025